02 / Development Potential
FOUR-BUILDING CONCEPTProposed Warehouse
Campus
The conceptual aerial illustrates a four-building warehouse and fulfillment arrangement. Review the development details below and the engineering plan in Site Plans & Materials.
Documented Site Considerations
Site Considerations
- Property boundary / acreage
- County deeded area: 56.1374 AC; plan annotation: 60.0733 AC. Reconciliation required.
- Powerline easements
- 60′ VEPCO easement and approximate easement locations annotated
- Other utility corridors
- 30′ permanent utility easement and pipeline easement shown
- Environmental areas
- RPA line shown; delineation and permitted impacts require review
- Buffers
- Proposed 35′ and 50′ minimum buffers annotated
- Road right-of-way
- Future extension and proposed R/W reservation shown; “½ section by others” noted
Renderings illustrate a development idea. They do not establish surveyed boundaries, buildable acreage, wetlands determinations, utility capacity or approved road access.